DUNS: 61-362-0558 

Home
Up

Download  Brochure here!

 

 INTAKE COVER ASSEMBLY MACHINE

The bottom cover to the 6.1 liter Hemi intake manifold is installed in this station.

The Manifold is placed into the fixture, upside down. A gasket is placed in position on the manifold, which is verified to be in place before the station continues.

 

The cover is placed onto the manifold, then each of the fasteners is inserted in the holes.

Using a (2) axis servo table to automatically re-position the manifold to each of the fastener positions under the automatic, electronic Cleco driver.

The fasteners are tightened in specific sequence, and to exact torque specification. The feature rich controller will graph the results of each fastener, as well as having the capability to export the results via various communication formats.

Key Benefits

bulletAssurance that the gasket has been installed before the cover is attached
bulletEach fastener is tightened to the proper torque specification
bulletAll fasteners are certain to have been installed
Send mail to steve@coastalbendtooling.com with questions or comments about this web site.
Last modified: 05/26/17